Important Considerations When Performing a Sync to Production
Configurations Sync
At times, Configuration Syncs to production interfere with Change Data Capture (CDC) and Replication Sync services. Specific steps need to be taken to manage CDC services in conjunction with a Configuration Sync to ensure CDC services continue to run successfully following the sync. Similarly, Configuration Syncs can also interfere with Replication Syncs.
After a Configuration Sync completes, certain tables associated with Replication Syncs may need to be both re-created and repopulated with historical data. For these reasons, Configuration Syncs to production must be performed by Eccovia’s Engineering Department and scheduled according to Eccovia’s Change Management Policy.